ANALYZING CRITICAL SUCCESS FACTORS AND RISKS IN PROJECT MANAGEMENT PRACTICES IN DEVELOPING COUNTRIES

https://doi.org/10.55452/1998-6688-2026-23-2-504-523

Abstract

Project management has primarily developed within high-income countries. However, over the last 15 years, capital-intensive projects have been shifting toward developing nations where conventional frameworks often underperform. Despite this, research on the critical success factors (CSFs) and risks influencing project outcomes in developing countries remains fragmented. This paper conducts a systematic literature review of 41 peer-reviewed articles published in the Scopus database in the last decade, covering 20 developing countries and 8 cross-country studies. Following the PRISMA protocol, this study identifies CSFs and risks in project management (PM) in developing countries through inductive review and deductive coding based on two theoretical lenses, namely, institutional and contingency theory. Furthermore, this paper analyzes the mechanisms and contextual dependency of these factors. The inductive findings identify 22 CSFs and 21 risk factors. In order to report the most critical ones, 8 CSFs and 8 risks are retained based on their frequency of occurrence. The results reveal that they form systematic corresponding pairs, with six of the eight CSFs directly mapping onto six risks. Moreover, institutional theory (IT) explains the dominance of external influences through coercive, normative, and mimetic mechanisms, as well as institutional voids, while the contingency theory (CT) shows variable outcomes across different project characteristics. Overall, the findings provide practical implications for project managers, policy makers and business organizations on managing projects in emerging countries. It is noted that project strategies should be adapted to project scale, with stakeholder-focused approaches in small projects, institutional building in medium projects, and macroeconomic and political risk management in large projects.

About the Authors

Zh. M. Aralbayeva
“ADCB” Islamic Bank JSC
Kazakhstan

Collateral Officer.

Almaty



A. Bakdaulet
Dream Space Decoration Cooperation
Kazakhstan

Project Manager.

Almaty



References

1. Kadry, M., Osman, H., and Georgy, M. Causes of construction delays in countries with high geopolitical risks. Journal of Construction Engineering and Management, 143 (2), 04016095 (2017). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001222

2. Ullah, M., Khan, M.W.A., Kuang, L.C., Hussain, A., Rana, F., Khan, A., and Sajid, M.R. A structural model for the antecedents of sustainable project management in Pakistan. Sustainability, 12 (19), 8013 (2020). https://doi.org/10.3390/su12198013

3. Tranfield, D., Denyer, D., and Smart, P. Towards a methodology for developing evidence-informed management knowledge by means of systematic review. British Journal of Management, 14 (3), 207–222 (2003). https://doi.org/10.1111/1467-8551.00375

4. Page, M.J., McKenzie, J.E., Bossuyt, P.M., et al. The PRISMA 2020 statement: An updated guideline for reporting systematic reviews. BMJ, 372, n71 (2021). https://doi.org/10.1136/bmj.n71

5. Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK Guide), 8th ed. (Newtown Square, PA: Project Management Institute, 2025).

6. Kerzner, H. Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 12th ed. (Hoboken, NJ: Wiley, 2017).

7. Flyvbjerg, B. What you should know about megaprojects and why: An overview. Project Management Journal, 45 (2), 6–19 (2014). https://doi.org/10.1002/pmj.21409

8. DiMaggio, P.J., and Powell, W.W. The iron cage revisited: Institutional isomorphism and collective rationality in organizational fields. American Sociological Review, 48 (2), 147–160 (1983). https://doi.org/10.2307/2095101

9. North, D.C. Institutions, Institutional Change and Economic Performance (Cambridge: Cambridge University Press, 1990). https://doi.org/10.1017/CBO9780511808678

10. Lawrence, P.R., and Lorsch, J.W. Organization and Environment: Managing Differentiation and Integration (Boston: Harvard Business School Press, 1967).

11. Donaldson, L. The Contingency Theory of Organizations (Thousand Oaks, CA: Sage Publications, 2001). https://doi.org/10.4135/9781452229249

12. Wadongo, B., and Abdel-Kader, M. Contingency theory, performance management and organisational effectiveness in the third sector: A theoretical framework. International Journal of Productivity and Performance Management, 63 (6), 680–703 (2014). https://doi.org/10.1108/IJPPM-09-2013-0161

13. Shafiei, N.A., and Puttanna, K. Critical success factors for international development projects in Afghanistan: An exploratory factor analysis. Journal of Project Management, 7 (3), 173–188 (2022). https://doi.org/10.5267/j.jpm.2022.5.001

14. Durna, E., Ozorhon, B., and Çağlayan, S. Identifying critical success factors of public-private partnership projects in Türkiye. Sakarya University Journal of Science, 28 (2), 1–14 (2024). https://doi.org/10.16984/saufenbilder.1334483

15. Pham, V.Q., Nguyen, B.K.Q., Van Tu, B., Pham, H.T.T., and Le, T.Q. Critical success factors of project management: The case of construction related projects in Vietnam. Journal of Asian Finance, Economics and Business, 6 (2), 223–230 (2019). https://doi.org/10.13106/jafeb.2019.vol6.no2.223

16. Saddiqa, A., Shehzad, M.U., and Mohiuddin, M. Effects of contractual governance on IT project performance under the mediating role of project management risk: An emerging market context. Information, 14 (9), 490 (2023). https://doi.org/10.3390/info14090490

17. Teklemariam, M.A., and Mnkandla, E. Software project risk management practice in Ethiopia. Electronic Journal of Information Systems in Developing Countries, 79 (1), 1–14 (2017). https://doi.org/10.1002/j.1681-4835.2017.tb00583.x

18. Sepúlveda-Rivillas, C.I., Alegre, J., and Oltra, V. The core functions of project management in an emerging economy: A new measurement scale. International Journal of Project Organisation and Management, 14 (4), 401–428 (2022). https://doi.org/10.1504/IJPOM.2022.125878

19. Alade, T.A., Bukoye, O.T., Roehrich, J.K., and Edelenbos, J. Cross-national collaboration in strategic transport projects: The impact on benefits realization. International Journal of Project Management, 40 (4), 347–361 (2022). https://doi.org/10.1016/j.ijproman.2022.03.009

20. Kambar, R., Ismailova, R., Aitbayeva, A., Mukhamejanuly, S., and Zharov, Y. Assessing the implementation of project management in public administration: A PEST analysis approach. Journal of Governance and Regulation, 14 (4), 220–231 (2025). https://doi.org/10.22495/jgrv14i4art20

21. Kavishe, N., and Chileshe, N. Identifying project management practices and principles for publicprivate partnerships in housing projects: The case of Tanzania. Sustainability, 10 (12), 4609 (2018). https://doi.org/10.3390/su10124609

22. Nguyen, P.T., Likhitruangsilp, V., and Onishi, M. Success factors for public-private partnership infrastructure projects in Vietnam. International Journal on Advanced Science, Engineering and Information Technology, 10 (2), 631–637 (2020). https://doi.org/10.18517/ijaseit.10.2.5839

23. Alawneh, R., Jannoud, I., Rabayah, H., Asaad, S., Almasaeid, H., Imam, R., and Ghazali, F.E.M. Development of a new method for assessing project risks in sustainable building construction projects in developing countries: The case of Jordan. Buildings, 14 (6), 1573 (2024). https://doi.org/10.3390/buildings14061573

24. Ottaviani, F.M., Zenezini, G., Saba, F., De Marco, A., and Gavinelli, L. System-level critical success factors for BIM implementation in construction management: An AHP approach. Systems, 13 (2), 94 (2025). https://doi.org/10.3390/systems13020094

25. Hillson, D. Project risks, causes, and effects. Project Management Institute (2000). https://www.pmi.org/learning/library/2019/04/07/15/14/project-risks-causes-risks-effects-4663

26. Memon, A.H., Memon, A.Q., Khahro, S.H., and Javed, Y. Investigation of project delays: Towards a sustainable construction industry. Sustainability, 15 (2), 1457 (2023). https://doi.org/10.3390/su15021457

27. Kwofie, T.E., Aigbavboa, C.O., and Thwala, W.D. Communication performance challenges in PPP projects: Cases of Ghana and South Africa. Built Environment Project and Asset Management, 9 (5), 628–641 (2019). https://doi.org/10.1108/BEPAM-11-2018-0137

28. Kavishe, N., Jefferson, I., and Chileshe, N. An analysis of the delivery challenges influencing publicprivate partnership in housing projects: The case of Tanzania. Engineering, Construction and Architectural Management, 25 (2), 202–240 (2018). https://doi.org/10.1108/ECAM-12-2016-0261

29. Shafiei, N.A., and Puttanna, K. An investigation into the factors causing international development project failure in developing countries: Focus on Afghanistan. Journal of Project Management, 6 (3), 133–142 (2021). https://doi.org/10.5267/j.jpm.2021.2.002

30. Amoah, A., Berbegal-Mirabent, J., and Marimon, F. What drives project management success in developing countries? The case of Ghana. Tec Empresarial, 16 (2), 22–46 (2022). https://doi.org/10.18845/te.v16i2.6186

31. Owusu, E.K., Chan, A.P.C., and Hosseini, M.R. Impacts of anti-corruption barriers on the efficacy of anti-corruption measures in infrastructure projects: Implications for sustainable development. Journal of Cleaner Production, 246, 119078 (2020). https://doi.org/10.1016/j.jclepro.2019.119078

32. Kassem, M.A., Khoiry, M.A., and Hamzah, N. Assessment of the effect of external risk factors on the success of an oil and gas construction project. Engineering, Construction and Architectural Management, 27 (7), 1683–1715 (2020). https://doi.org/10.1108/ECAM-10-2019-0573

33. Ali, T., Butt, A., Arslan, A., Tarba, S.Y., Sniazhko, S.A., and Kontkanen, M. International projects and political risk management by multinational enterprises: Insights from multiple emerging markets. International Marketing Review, 38 (5), 957–983 (2021). https://doi.org/10.1108/IMR-03-2020-0060

34. Khanna, T., and Palepu, K.G. Winning in Emerging Markets: A Road Map for Strategy and Execution (Boston: Harvard Business Press, 2010).

35. Barajei, C., Kusi, E., Ackon, F., Osman, A.M., Mohammed, A.M.Z., Simpeh, F., and Gyimah, F. Success factors of the consultant selection stage of the Ghanaian public construction projects: The road sector’s perspective. Construction Economics and Building, 24 (1/2), 1–20 (2024). https://doi.org/10.5130/AJCEB.v24i1/2.8660

36. Ebekozien, A., Aigbavboa, C., Samsurijan, M.S., Ahmed, M.A.H., Akinradewo, O., and Omoh-Paul, I. Managing construction project risks in turbulent times: A stakeholders’ perspective. International Journal of Building Pathology and Adaptation, 42 (3), 445–463 (2024). https://doi.org/10.1108/IJBPA-01-2024-0003

37. Kassem, M.A., Khoiry, M.A., and Hamzah, N. Risk factors in oil and gas construction projects in developing countries: A case study. International Journal of Energy Sector Management, 13 (4), 846–861 (2019). https://doi.org/10.1108/IJESM-11-2018-0002

38. Dufková, G. Time and budget overruns on Czech international development projects. Ekonomický časopis, 70 (7–8), 651–671 (2022). https://doi.org/10.31577/ekoncas.2022.07-8.04

39. Ugonna, D.C.U., Ochieng, E.G., and Zuofa, T. Augmenting the delivery of public research and development projects in developing countries. Journal of Building Pathology and Adaptation, 42 (3), 445–463 (2024). https://doi.org/10.1108/IJBPA-01-2024-0003

40. Shih, H.-S., Chen, I.-F., Munier, N., and Alcide, Z. Investigating risk-constraint nexus of construction projects in Caribbean small island developing states. SAGE Open (2023). https://doi.org/10.1177/21582440231158023

41. Sarvari, H., Chan, D.W.M., Alaeos, A.K.F., Olawumi, T.O., and Abdalridah Aldaud, A.A. Critical success factors for managing construction small and medium-sized enterprises in developing countries of Middle East: Evidence from Iranian construction enterprises. Journal of Building Engineering, 43, 103152 (2021). https://doi.org/10.1016/j.jobe.2021.103152

42. Sun, H., Tang, W., Duffield, C.F., Zhang, L., and Hui, F.K.P. How to get international construction projects delivered on time: From Chinese contractors’ perspective. Journal of Civil Engineering and Management, 28 (5), 365–377 (2022). https://doi.org/10.3846/jcem.2022.16381

43. De Marco, A., and Narbaev, T. Factors of schedule and cost performance of tunnel construction megaprojects. The Open Civil Engineering Journal, 15 (1), 15–38 (2021). https://doi.org/10.2174/1874149502115010038

44. De Marco, A., Narbaev, T., Ottaviani, F.M., and Vanhoucke, M. Influence of cost contingency management on project estimates at completion. International Journal of Construction Management, 24 (9), 935–945 (2024). https://doi.org/10.1080/15623599.2023.2239487

45. Kang, Y., Jin, Z., Hyun, C., and Park, H. Construction management functions for developing countries: The case of Cambodia. Journal of Management in Engineering, 34 (4), 04018017 (2018). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000609

46. Aghimien, D.O., Aigbavboa, C.O., and Thwala, W.D. Microscoping the challenges of sustainable construction in developing countries. Journal of Engineering, Design and Technology (2019). https://doi.org/10.1108/JEDT-01-2019-0002

47. Ahmad, M.I., Sukamani, D., Wang, J., and Kusi, M. Risk factors and their impact on the success of construction firms: A comparative study between Pakistan and Nepal. IAENG International Journal of Applied Mathematics, 52 (3), 518–527 (2022).

48. Olusola, J., and Phung, Q. A framework for adopting smart contracts in the Nigerian construction industry. International Journal of Construction Management, 25 (1), 45–58 (2025). https://doi.org/10.1080/15623599.2025.2550478


Review

For citations:


Aralbayeva Zh.M., Bakdaulet A. ANALYZING CRITICAL SUCCESS FACTORS AND RISKS IN PROJECT MANAGEMENT PRACTICES IN DEVELOPING COUNTRIES. Herald of the Kazakh-British Technical University. 2026;23(2):504-523. https://doi.org/10.55452/1998-6688-2026-23-2-504-523

Views: 35

JATS XML


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 1998-6688 (Print)
ISSN 2959-8109 (Online)